How Long Is the St. Croix River Bridge

Updated · 5 min read

Measuring the length of a major river crossing can be tricky because engineers define the span in different ways. While the main river bridge is the focal point, the total project length includes approach roads and embankments that extend the footprint significantly. Understanding these dimensions helps clarify why the project required such a massive investment of time and resources to move traffic away from the historic downtown corridor.

What is the official name of the bridge connecting Stillwater, Minnesota, to St. Joseph, Wisconsin?

The official name is the St. Croix Crossing. A lot of people assume it is named the Stillwater Bridge, but that title historically refers to the 1931 lift bridge downtown. Using the correct name helps avoid confusion for emergency services and navigation apps, as the two structures serve very different transit needs. The new crossing carries Highway 36, while the older bridge was converted into a pedestrian and bicycle trail, meaning they don't even share the same traffic designation or access points for motorized vehicles.

At a glance

FeatureMeasurement
Main bridge length3,365 feet
Total project length0.9 miles
Vertical clearance85 feet
Bridge width85 feet

When was the St. Croix Crossing bridge opened to public traffic?

The St. Croix Crossing officially opened to public traffic on August 2, 2017.

  • 2017 marks the transition from the aging, narrow lift bridge to this modern, high-capacity expressway connection.
  • August was selected for the opening to minimize disruption to the busy summer tourism season in the St. Croix Valley.
  • Traffic flow improved immediately upon opening, as the new route bypassed the downtown Stillwater gridlock that had plagued commuters for decades.
  • Construction spanned roughly three years, following years of intense environmental review and multi-state negotiations regarding the river's protected status.

What type of engineering design was utilized for the construction of this bridge?

The bridge utilizes an extradosed design, which blends elements of both box girder and cable-stayed bridges. This configuration features five towers rising above the deck, providing a sleek profile that minimizes the visual impact on the river valley while supporting the heavy concrete spans.

Which government agencies were responsible for the planning and funding of the project?

The project was a collaborative effort between the Minnesota Department of Transportation and the Wisconsin Department of Transportation, with federal oversight.

  • MnDOT acted as the lead agency, managing the daily logistics and engineering oversight for the primary construction phases.
  • WisDOT provided essential funding and coordination to make sure the bridge met the connectivity requirements for western Wisconsin residents.
  • FHWA involvement was mandatory because the project utilized federal highway funds and required federal environmental impact statements.
  • St. Croix stakeholders, including local municipalities, participated in years of planning sessions to balance regional growth with the preservation of the river's scenic character.

How does the bridge design address environmental concerns regarding the St. Croix River National Scenic Riverway?

Yes, the design incorporates a low-profile aesthetic and specific lighting controls to protect the riverway. By using five shorter towers rather than one massive pylon, the bridge maintains a height of only 100 feet above the water, preserving the natural viewshed of the National Scenic Riverway.

What was the total cost associated with the design and construction of the St. Croix Crossing?

The total project cost reached approximately $646 million, encompassing design, land acquisition, and the construction of the bridge and its approaches.

CategoryCost (Millions)
Main Bridge$350
Approach Roads$180
Planning/Environmental$60
Mitigation/Other$56

Use these figures to understand the scale of investment required for a major interstate crossing that meets modern environmental and safety standards.

How does the current bridge compare in capacity and traffic flow to the historic lift bridge it replaced?

The St. Croix Crossing provides significantly higher capacity, featuring four lanes of traffic that eliminate the bottleneck issues common to the old lift bridge. The historic lift bridge relied on a single lane in each direction and required frequent closures for river traffic, which often caused backups stretching miles into downtown Stillwater. The new structure allows for continuous, high-speed travel, effectively separating regional commuters from local pedestrian traffic.

One notable nuance is that the new bridge does not entirely remove congestion, as it merely shifts the pressure point to the highway interchanges on either side of the valley. While the bridge itself handles thousands more vehicles per day than the lift bridge ever could, the surrounding road network remains a limiting factor during peak rush hours.

What specific materials were used to ensure the structural longevity of the bridge over the river?

Engineers utilized high-performance concrete and post-tensioned steel tendons to maximize the structural lifespan and durability of the bridge.

MaterialPurpose
ConcretePrimary load-bearing structure
Steel TendonsInternal tension reinforcement
Epoxy CoatingCorrosion protection for rebar
Expansion JointsThermal movement management

These materials work together to withstand the freeze-thaw cycles common in the Midwest, ensuring the bridge remains structurally sound for several decades.

What people often get wrong

  • Confusing the lift bridge with the new crossing. People often mix up the historic 1931 lift bridge with the new structure; they are separate crossings with different lengths and purposes.
  • Ignoring the approach spans. Many assume the bridge is only the part over the water, but the total project includes substantial land-based approach segments.
  • Misjudging the height. The bridge is designed for high clearance, which is a different metric than its horizontal length, though both are often conflated in casual conversation.

Understanding the St. Croix Crossing dimensions

Check local traffic maps before your trip to see how the bridge length affects travel times during peak commuting hours. Familiarizing yourself with the bridge layout will help you better anticipate exit points on either side of the river.

Latest posts

  1. How Long Is the St. Croix River Bridge
  2. Does Leave No Trace Include Pee? Guidelines for Wilderness
  3. How to Bring Pollinators to Your Garden for Better Growth
  4. How Deep Is the St. Croix River and Why It Changes
  5. How to Study Bird Migration Methods and Best Practices
  6. The 5 C's of Photography Explained for Better Images
  7. What to Do Before Traveling A Pre-Departure Checklist
  8. Understanding Contrast in Photography with Examples
  9. St Croix River Shoreline Protection Best Practices
  10. Marine on St Croix Heritage Walks Planning Essentials