How Long Is the St. Croix River Bridge Dimensions Explained
Measuring a bridge of this scale isn't just about the main span over the water. Engineers calculate the total length by including the approach viaducts that transition traffic from the highway elevation down to the river crossing. Because the St. Croix River valley features significant topographical changes, the bridge length was dictated as much by the height of the bluffs as by the width of the river itself.
What is the official name of the st. croix river bridge?
The official name is the St. Croix Crossing. Many people mistakenly refer to it as the Stillwater Bridge, which is a common error because the structure replaced the historic Stillwater Lift Bridge located just downstream. While the old lift bridge remains a landmark for pedestrians and cyclists, it no longer serves as a primary arterial route for motor vehicles. It’s a common point of confusion for locals and tourists alike, as the two structures serve very different purposes in the modern regional transportation network.
At a glance
| Feature | Measurement |
|---|---|
| Total Length | 3,380 feet |
| Main Span | 600 feet |
| Bridge Width | 88 feet |
| Vertical Clearance | 85 feet |
Which two states are connected by this infrastructure project?
The St. Croix Crossing connects the states of Minnesota and Wisconsin, specifically linking the city of Oak Park Heights to the township of St. Joseph.
- Minnesota serves as the western terminus, handling high-volume commuter traffic flowing toward the Twin Cities metropolitan area.
- Wisconsin provides the eastern anchor, where the bridge integrates with Highway 64 to facilitate regional travel across the St. Croix River valley.
- 2017 marks the year these two states finally achieved a unified crossing solution after decades of legislative debate and environmental review.
- 12,000 vehicles per day were projected to utilize this corridor initially, though actual usage has frequently exceeded these early estimates.
When was the construction of the bridge completed and opened to traffic?
Construction of the St. Croix Crossing finished in late 2017, and the bridge officially opened to public traffic on August 2, 2017. This completion marked the end of a multi-year project designed to replace the aging lift bridge with a modern, high-capacity expressway.
What type of structural design was utilized for the crossing?
The structural design utilizes an extradosed cable-stayed bridge system. This configuration combines elements of traditional girder bridges and cable-stayed designs, allowing for a lower profile that minimizes the visual impact on the scenic river valley. The deck is supported by concrete towers that rise above the roadway, with cables radiating out to hold the segments in place. A concrete example of this engineering is the use of post-tensioned segmental concrete box girders, which were cast in sections and moved into place to form the long, sweeping spans.
One nuance in this design is the height of the towers. Unlike a standard cable-stayed bridge where the towers are quite tall, the extradosed design keeps the pylons relatively short. This choice was deliberate to comply with strict aesthetic and environmental guidelines that restricted how much the bridge could obstruct the horizon line of the river bluffs.
How does the bridge impact traffic congestion in the St. Croix Valley region?
The bridge significantly reduces traffic congestion by diverting heavy through-traffic away from the narrow, historic streets of downtown Stillwater.
- 18,000 vehicles that previously clogged the downtown lift bridge area are now rerouted to the more efficient expressway corridor.
- 15 minutes is the typical time saved for commuters traveling between the two states during peak afternoon rush hours.
- Stillwater streets have experienced a noticeable decline in semi-truck traffic, which has improved safety and air quality for the downtown core.
- Highway 36 functions much better now that the bottleneck at the river crossing has been effectively bypassed by the new span.
What were the primary environmental considerations during the planning and building phases?
Environmental considerations were the most significant hurdle during the planning phase because the St. Croix River is a federally protected Wild and Scenic River. Engineers had to account for the migration patterns of local wildlife, particularly the endangered Higgins eye pearlymussel. To protect these aquatic species, the construction team implemented strict sediment control measures and utilized specialized barges to make sure that no debris fell into the riverbed during the assembly of the bridge segments.
One exception to the standard construction process was the lighting plan. The bridge features specialized downward-facing, shielded LED fixtures to minimize light pollution. This design choice was required to protect the nocturnal environment of the valley, ensuring that the bridge does not interfere with the natural habitats or the dark-sky qualities of the surrounding river corridor.
What is the total cost associated with the design and construction of the bridge?
The total cost for the design and construction of the St. Croix Crossing reached approximately $646 million. This figure encompasses the bridge structure, the approach roads, and the extensive environmental mitigation efforts required by federal law.
| Project Phase | Estimated Cost |
|---|---|
| Bridge Structure | $300 million |
| Approach Roads | $180 million |
| Environmental Mitigation | $90 million |
| Engineering and Design | $76 million |
Use these figures to understand how environmental and regulatory requirements can account for nearly 15 percent of a major infrastructure budget.
How does the bridge accommodate pedestrian and bicycle traffic?
Yes, the bridge includes a 12-foot-wide bicycle and pedestrian path separated from the main roadway by a concrete barrier. This path connects to a larger trail network on both sides of the river, allowing users to traverse the entire 3,380-foot length safely.
What people often get wrong
- Confusing the main span with total length. The main span is only 600 feet, which is just a fraction of the full 3,380-foot structure.
- Ignoring the approach spans. People often overlook the concrete viaducts, but these sections make up the majority of the bridge's footprint.
- Misjudging the height. The bridge sits high above the water, but its length is what truly defines its massive presence in the valley.
Understanding bridge scale and design
When evaluating the size of this infrastructure, look past the main river crossing to appreciate the full extent of the approach spans. Checking local department of transportation maps will provide the most accurate data regarding the bridge's footprint and its integration into the surrounding highway network.